Management of the batching room of the injection molding workshop!!

datetime:2020-06-19 13:14:01 Visits:218 Source:思柏精密

Management of the batching room of the injection workshop


1. Formulate the management system of batching room and guidelines for batching work;


2. The raw materials, toner, and mixers in the batching room should be placed in different areas;


3. The raw materials (water-containing materials) should be sorted and placed, and they must be marked well;


4. Toner should be placed on the toner rack and must be identified (toner name, toner number);


5. The mixer should be numbered/identified, and the use, cleaning and maintenance of the mixer should be done;


6. Supplies equipped with cleaning mixer (fire water, rags);


7. The prepared ingredients need to be sealed or tied with a bag sealing machine, and affixed with identification paper (specify: raw materials, toner number, use machine, ingredient date, product name/code, ingredient staff, etc.;


8. Use of ingredient kanban and ingredient notice, and do a good job of recording the ingredients;


9. The white/light color material needs to be compounded with a special mixer and keep the environment clean;


10. Train the batching personnel on business knowledge, job responsibilities and management system;


请填写下方表单,我们会尽快与您联系
感谢您的咨询,我们会尽快给您回复!